Tip 2: “October addition” | Involving Design Factors for client

 Our Monday "Tip of the week"



This month we'll talk about "Who or What is involved in design stage"?. 

Tip 2: Functions of the people involved in the "design process"


Recap of Tip 1: Who is involved during the "design process"? 

 

Prep work:


Functions of MI-GLIS:

  1. Find surveyor
  2. Request copy of parcel cards
  3. Request a mortgage extract
  4. Request parcel ID
  5. Copies of important deeds

 Functions of MOS:

 

  1. Geotechnical Field Research
  2. Laboratory research
  3.  Geotechnical advice
  4.  Geohydrological advice
  5.  Geomonitoring

 

Functions of RC Designs:

  1.  request program requirements
  2.  Intermediary for the collaboration with GLIS and MOS

 

Design:

 

Functions of RC Designs architectural engineer:


  1.  structural drawings
  2.  preliminary design process
  3.  final design process
  4.  construction drawings
  5.  installation drawings
  6.  working drawings
  7. interior & exterior drawings
  8. Intermediary for the collaboration with consultants and constructors

Functions of RC Designs’s constructor:


o   Calculating the construction for :

  1. Usage of woodwork (columns, roof construction, 2nd floor construction)
  2. Usage of concrete (foundation, columns, beams and concrete flooring or walls)
  3. Usage of steel (columns, beams and roof construction)

Comments

Most popular